JasonJ
Rear Admiral
- Joined
- Aug 20, 2001
- Messages
- 4,163
I have spent the last few afternoons after work cutting and fitting stringers. Mind numbing. I still need to cut and install the crossbraces, then I can glass the whole mess in. They are mostly all level, I will use the trusty belt sander to do the final leveling when the stringers are cured. Also installed the tube for wiring and controls...<br /><br />
<br /><br />
<br /><br />


