16' S/S rebuild ( 3 month project)

Pugetsound

Lieutenant Commander
Joined
Apr 5, 2009
Messages
1,824
Putting the 16 SS back together. Need to do the steering, wireing and the motor. Then its ready for my Maiden voyage. Another day or two as the motor was torn down a bit to rebuild the tilt and steering tube. Every thing new except the Tin ,:redface:I hope the paint holds up previous restorations have had some issues. I will have a friend do the photo thing as its just to complicated for me to deal with.
 

Bwana Don

Lieutenant Commander
Joined
Oct 20, 2009
Messages
1,951
Re: 16' S/S rebuild ( 3 month project)

Yea pictures. Well that went pretty quick, almost ready to splash it.
 

Pugetsound

Lieutenant Commander
Joined
Apr 5, 2009
Messages
1,824
Re: 16' S/S rebuild ( 3 month project)

QUICK ????? LOL seemes like a lifetime. Sure wish I could figure nthe photos out I have a complete tear down and rebuild in a folder called ( My Pictures) I have to be able to forward the whole thing to the photo bucket and download to a forum. Could have used better uphoulstery but used what I had . Thats easy to change later but Im happy and thats all that realy matters. Also decided to use Marine Vinyl on the sides and the bow. I like it a lot and weont slip on it.
 

Huron Angler

Admiral
Joined
Apr 7, 2009
Messages
6,025
Re: 16' S/S rebuild ( 3 month project)

Glad to hear you are almost there, I also like the marine vinyl for the grip even when it's wet.

Did the vinyl smooth out nicely for ya?
 

dozerII

Admiral
Joined
Oct 25, 2009
Messages
6,527
Re: 16' S/S rebuild ( 3 month project)

Way to go Puget, that is a real quick time line. But to quote someone from another thread some where in the Starmada.
"WE FIND YOUR LACK OF PICTURES QUITE DISTURBING"
 
Top