CraigBarnard
Petty Officer 1st Class
- Joined
- Nov 7, 2010
- Messages
- 269
Well winter is almost here so the interior refurbishing is getting started.
The "Rip & Tear" stage is the most fun.
Removing the old rotten floor boards and relocating the door to the center so I can have two pilot seats side by side.
Hopefully also open up some room for some additional seating.
Considering how badly rotten the wood was it was surprisingly difficult to remove.
Found some old tin pieces nailed to the floor with roofing nails under the carpet. I assume a lame attempt at providing some solid footing.
Also found a nice flashlight!! Freebie!





The "Rip & Tear" stage is the most fun.
Removing the old rotten floor boards and relocating the door to the center so I can have two pilot seats side by side.
Hopefully also open up some room for some additional seating.
Considering how badly rotten the wood was it was surprisingly difficult to remove.
Found some old tin pieces nailed to the floor with roofing nails under the carpet. I assume a lame attempt at providing some solid footing.
Also found a nice flashlight!! Freebie!




