AirborneJarhead
Recruit
- Joined
- Mar 2, 2004
- Messages
- 1
I want to install a livewell and double-duty the pump as a washdown system. I'm thinking about using a 750gph thru-hull livewell pump (or even a bilge pump of a higher capacity), running the hose up to a tackle station, fitting a Y connector, and running 2 seperate hoses...one for a part-time livewell and one to a prefab washdown hose with nozzle. Does this sound feasible? I know I won't be able to use both at the same time and I know that the wasdown pressure will be minimal. I really don't need a high pressure washdown...just something to wet the decks and to rinse.<br />Any suggestions or thoughts are GREATLY appreciated.<br /><br />Thanks,<br /><br />Rick