TwoBallScrewBall
Lieutenant Commander
- Joined
- Sep 14, 2003
- Messages
- 1,695
I am setting deck support posts. <br /><br />I have a 18" wide X 32" deep hole that has a 12" thick concrete footer in it. Today I set the posts on top of that in another 9-10" of concrete with anchors on the posts. So now I have about 1.5-2 feet of hole left. <br /><br />How long do I have to wait before I can fill them with dirt? It's 80 pound sacks of "sakrete" from home depot. I didn't see this specification on the bag instructions. <br /><br />Thanks.