Was very happy to see my machined power head returned to my boat mechanic and finding machine work and power head assembly was only gonna cost about $750; That includes 4 new .020 pistons/rings and new caged bearings. (upper rod) and gasket set. He claimed lower rod and crank bearings were good.
Not knowing what failed, he is going to rebuild both carbs and recommended new fuel pump. While going through all this, any suggestions on anything else to look for or replace would be appreciated.
Thanks and sorry for long post, Joe
Ive been working with this mechanic for bout 20yrs, and he sounds very confident on the rebuild, which makes me feel comfortable.
Not knowing what failed, he is going to rebuild both carbs and recommended new fuel pump. While going through all this, any suggestions on anything else to look for or replace would be appreciated.
Thanks and sorry for long post, Joe
Ive been working with this mechanic for bout 20yrs, and he sounds very confident on the rebuild, which makes me feel comfortable.