Here in central IL, it's not boating season, it's road construction season. Can someone explain the reasons for the following sequence of events?
5-Mile Stretch of a 4-lane hwy (heavy morning and evening traffic):
0-2 months: dig-up every other 50 feet of concrete then patch it with blacktop
Month #3: completely strip/grind-up the top 4 inches off all 4 lanes
Months 4-6: black-top all 4 lanes and paint lines
Why waste the first 2 months patching in with blacktop if the entire road will be blacktopped in the end? Is this how our stimulus money is being spent because I've never seen this done before until 2009.
5-Mile Stretch of a 4-lane hwy (heavy morning and evening traffic):
0-2 months: dig-up every other 50 feet of concrete then patch it with blacktop
Month #3: completely strip/grind-up the top 4 inches off all 4 lanes
Months 4-6: black-top all 4 lanes and paint lines
Why waste the first 2 months patching in with blacktop if the entire road will be blacktopped in the end? Is this how our stimulus money is being spent because I've never seen this done before until 2009.