Well it's been a while, but we got enough done on the boat to launch it this past July 4th. Here's some pics:
Epoxied in pieces to copy the original flotation boxes. I'm not actually making boxes here for foam. I'm just adding more support for the transom
Drilled holes for flotation foam:
The foam
Installing the foam. This was probably the most enjoyable part of the entire project lol
Here's with all the holes patched, and I primed & painted the transom area
Time for the cap again! Hated this part
Installed new rub rail:
Other side after installing new rub rail:
Installed new seats. I did *not* screw the seats to the floor. I ran small strips of glass over the cross members and expoxied it to the floor. After the seats were installed I primed the floor.
Motor time
By the way I picked the the hottest day of the year to do this
Installed canopy, gathering items to launch!
Launched! Here's my son (15) taking it out on it's first run.
Pulls a tube like a boss
Remaining things I need to do:
- Install gas tank (sending unit was backordered)
- build a bench seat in the back
- install fuel gauge
- install stereo system