Re: 1980 Sea Nymph SS 165 Rebuild
Ah sheesh fellas, there is no way this thing is going to Sea Trial this week:redface::facepalm: I'm trying but like DJ said, the heat/humidity monkeyed with my schedule a little, I think it contributed some to my drips in my paint job too, rats! Family duties bumped me some.
Man I have so much to do!
I suppose if I had a few
FULL days to work on er I could get there but, ah, yah, that aint happenen.
I think the best I can get is a Sea Trial the week of the 15th really. And that'll be just like bare bones functional boat. Hopefully just in time to take off for vacation.
I can see a lot of easier/quicker jobs that can be handled but the biggies I think are:
1) T&T swap job, general maintenance, clean/paint the Evinrude
2) All the rigging, electrical, plumb, yada - very time consuming
3) Splashwell mod and install
4) The whole stern deck/bench/hatch set up. This is going the crux of the whole project I think. I'm pretty sure this part will have to wait till after as I can see me fitting it in the schedule.
I only have two weeks
(by the way, batt placement will be easy on this rig


)