Gman 82 aquasport
Seaman Apprentice
- Joined
- Mar 25, 2011
- Messages
- 39
Re: 1982 Aquasport floor/stringer rebuild
Got layer of glass on bottom of floor for gas tank
Also got stringer tops put in place to pour foam Monday if temp holds. Pieces are held together with 1/4 in ply covered with packing tape and srewed to the stringer parts, after pouring will remove and fill srew holes then reglass ths stringers and add glassed wood to tops to attach the colsole and t-top.
Got layer of glass on bottom of floor for gas tank

Also got stringer tops put in place to pour foam Monday if temp holds. Pieces are held together with 1/4 in ply covered with packing tape and srewed to the stringer parts, after pouring will remove and fill srew holes then reglass ths stringers and add glassed wood to tops to attach the colsole and t-top.
