Hello boys...
It's been a long time since we posted something! We had to stop working due to my ACL Surgery and access to the forum wasn't possible anymore due to european GDPR...
After some research, I ended up using a VPN and *tadah*.... We have acces !
Anyway, surgery was a success, I'm now able to work again with my bro...
On his side, he cleaned and disassemble the transom gimbal housing, getting it ready for painting. We ordered new seals,hoses,etc....
We took it over where we had stopped.
So we glassed the inner side of our stringers. (we added a 3rd layer compared to the outer side)
Then we glued the wood for fuel tank compartment and the front end. We also placed the drain pipe.
(see photos)

We glassed the compartment sides and started grinding/cutting the stringers and compartment so we get a flat surface for the floor... but we figured out that the original floor wasn't flat at all and we were out of grinding paper

.
(no pics of this)
So next steps are finishing the wood grinding, cutting and placing the fuel tank floor on the drain pipe, placing the lower floor on the front side of the boat (under the cabin)... and glassing all that stuff...