daydreamer1252
Petty Officer 1st Class
- Joined
- Aug 7, 2007
- Messages
- 212
All right this is what happens when a PROJECT takes longer than projected
....originally thought about 6 months___year at most........ya sure. Been 2 1/2 years now, many delays not the least has been money. :redface: Had taken pics at the start but computer hard drive crash has seen to those...
I need pictures in as much detail as possible showing routing of raw water hose to themostat housing, showing routing of main wiring harness, mounting of coil, etc.
I could and can figure something out but would like to keep it as original as possible.
I have factory manuals (actual printed copies) but the black on black photos are not very helpful for this.
As always all help is appreciated..........
I need pictures in as much detail as possible showing routing of raw water hose to themostat housing, showing routing of main wiring harness, mounting of coil, etc.
I could and can figure something out but would like to keep it as original as possible.
I have factory manuals (actual printed copies) but the black on black photos are not very helpful for this.
As always all help is appreciated..........