My plan is to use Durabak as my final deck covering.With the Durabak being "polyurethane" should I use epoxie resin or poly resin to seal the deck with before applying the Durabak? Or does it really matter? I am using 3/4" exterior ply for the new deck is it nessesary to use cloth on both sides of the ply or the top only or do I even need to use it at all? Another thing I've read was to let the wood dry out before sealing it ..is that true with all ply or just PT wood?
thanks again for the great site..
thanks again for the great site..