Like all of us, I had projects I wanted to get done before springtime. Just wondering how far we all got with our lists, as time is getting near.
My list included;
A) Install remote spotlight - Done
B) Build a sundeck for the Admiral (Not done, but I have everything I need)
C) Install a digital fuel guage - Change of plans; installed a Floscan Fuel Monitor
D) Install 2nd Bilge pump - Done except 3way switch
E) Change the over-pitched prop - Done, wow what a difference the correct prop makes
F) Add battery switch and relocate second battery - Not done, can't afford the cable to move the battery
G) Chane all-around light - Done
H) Replace cheap plastic antenna mount with Stainless - Done
I) Fix leaking power steering line - Done, what a nightmare (for the mechanic that spent 6 hours on it)
J) Empty and completely clean out cabin - Done
K) Install downrigger - Change of plans - Going to use planers off the cleat
L) Fix soft flooring; one panel that is over the fuel tank - not done, should be by the end of the month tho
So that's pretty much my list. Except for the battery and floor, I'm comfortable with what I've gotten done so far. How about you and your list?
My list included;
A) Install remote spotlight - Done
B) Build a sundeck for the Admiral (Not done, but I have everything I need)
C) Install a digital fuel guage - Change of plans; installed a Floscan Fuel Monitor
D) Install 2nd Bilge pump - Done except 3way switch
E) Change the over-pitched prop - Done, wow what a difference the correct prop makes
F) Add battery switch and relocate second battery - Not done, can't afford the cable to move the battery
G) Chane all-around light - Done
H) Replace cheap plastic antenna mount with Stainless - Done
I) Fix leaking power steering line - Done, what a nightmare (for the mechanic that spent 6 hours on it)
J) Empty and completely clean out cabin - Done
K) Install downrigger - Change of plans - Going to use planers off the cleat
L) Fix soft flooring; one panel that is over the fuel tank - not done, should be by the end of the month tho
So that's pretty much my list. Except for the battery and floor, I'm comfortable with what I've gotten done so far. How about you and your list?